QC Certification Sample Questions

Q: 1 When a test set folder is linked to a cycle, are all of the test sets in the folder
linked to that cycle?
A. No, only a test set can be linked to a cycle
B. No, a test set folder can only be linked to a release
C. Yes, all of the test sets in the folder will be linked to that cycle
D. Yes, all of the test sets in the folder will be linked to the cycle and all other cycles in that release

Q: 2 What are the steps, in the correct order, to convert a requirement to a test?
A. make changes to the automatic conversion, select an automatic method
B. select convert to test, select the destination path, convert to automated test
C. select an automatic method, make changes to the automatic conversion, select the destination subject path
D. select the destination subject path, select an automatic method, make changes to the automatic conversion

Q: 3 When designing test steps it is important to ensure that all aspects of the
application are tested. When writing test steps, what are two things that should be done to ensure clear
and accurate steps? (Select two.)
A. specify all actual results
B. use parameters in the step names
C. specify pass and fail conditions for the step
D. use the numbering system for the step names
E. use consistent terminology throughout the test

Q: 4 What constitutes a release folder?
A. cycles of the release
B. test plan for the release
C. releases of the application
D. requirements for the release

Q: 5 What database can be used with Quality Center 9.2? Select two.
A. Access
B. Sybase
C. Microsoft SQL Server
D. Paradox
E. Oracle

Q: 6 What web client can be used with Quality Center 9.2?
A. Netscape
B. Safari
C. Firefox
D. Internet Explorer

Q: 7 What does a live analysis graph illustrate in a visual overview?
A. all the tests in the Test Plan
B. all the cycles or releases the test is linked to
C. all the requirements linked to the specified test
D. all the tests in a specified folder in the Test Plan

Q: 8 Where can you link tests to requirements?
A. from the Test Lab module
B. from the Requirements module
C. on the test details page (Test Plan)
D. on the attachments page (Test Plan)

Q: 9 What HP functional testing tools integrate with Quality Center? (Select two.)
A. HP OpenView
B. HP WinRunner
C. HP QuickTest Professional
D. HP LoadRunner
E. HP Change Control Management

Q: 10 How is a test configured as a template test?
A. The test type chosen must be MANUAL-TEMPLATE
B. The first step in the test must be named template test
C. Right-click on the test name and choose Template Test
D. During test planning, mark the checkbox, under details, labeled template Test

Q: 11 What test types can be created in Quality Center? Select three
A. batch-test
B. vugen-test
C. lr-scenario
D. system-test
E. interface-test
F. wr-automated test

Q: 12 Using the Excel Macro, what type of data can be imported into Quality
Center? (Select three.)
A. defects data
B. test set data
C. test plan data
D. releases data
E. test Instance data
F. requirements data

Q: 13 When a called test has parameters, when can you assign values to the
parameters?
A. values are assigned from within the calling test
B. values must be assigned when the test is executed
C. values are assigned during test design or execution
D. values must be assigned when the test is called, during test design

Q: 14 In order to reuse a test across other tests, must the reused test be a template
test?
A. yes, only template tests are reusable
B. no, the test must be a VAPI test to be reusable
C. yes, template tests are reusable automated tests
D. no, tests do not need to be template tests to be reused

Q: 15 While designing the test plan tree, you accidentally delete a folder that
contained some tests that you need. Can you recover the tests?
A. no, once a test is deleted, it is gone
B. yes, the tests can be recovered from the Subject folder
C. yes, the test can be recovered from the Unattached folder
D. no, only Project Managers have permission to recover deleted tests

Q: 16 How can you create a test plan tree?
A. convert releases to tests
B. define test folders and tests manually
C. save automated tests in Quality Center
D. define test names for each test needed

Q: 17 On the General page of the Excel Report Generator window, what name is
displayed, by default, in the designer field?
A. the project manager
B. the site administrator
C. the user currently logged in

Q: 18 Click the Exhibit button.
What does the icon in the exhibit indicate in the Test Plan module, under the Test Script tab?
A. there is a test script
B. there is not a test script
C. there is a manual test case
D. the test script has changed

Q: 19 Can you change the values of a called test’s parameters?
A. no, values are assigned at run time
B. yes, if the called test is a template test
C. no, you must delete the called test and call it again
D. yes, right-click and choose Called Test Parameters

Q: 20 How many buttons are available to create a Release Tree?
A. two
B. three
C. four
D. five

Answers:
Q1: C
Q2: C
Q3: C, E
Q4: C
Q5: C, E
Q6: D
Q7: D
Q8: B
Q9: B, C
Q10: C
Q11: C, D, F
Q12: A, C, F
Q13: C
Q14: D
Q15: C
Q16: B
D.17: D
Q18: A
Q19: D
Q20: B